Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяCandidate
Male, 70 years, born on 31 August 1954
USA, I want to relocate (Irkutsk), prepared for business trips
Начальник
10 000 $ in hand
Specializations:
- Head of production
Employment: project work
Work schedule: full day
Work experience 31 year 7 months
September 2011 — April 2012
8 months
Total Fina
Moscow
Brownfield Manager
* Responsible for engineering and implementation of all Brownfield tie-ins (~240) and plant piping of new processing complex. ;
* Lead a team of 14 senior lead engineers from UK & Russia
Joined Petrofac International Ltd in Feb 2004 and worked with them on the following projects:
July 2009 — August 2011
2 years 2 months
KPO/Petrofac
Aksay (Kazakhstan)
Site Enginering Manager
* Responsible for solution of all engineering issues related to the processing facilities and infield pipelines. ;
* Assist Project Management in organizing Project Handover as per local Laws. ;
August 2006 — July 2009
3 years
Petrofac
Irkutsk
Senior Project Engineering Coordinator
* Responsible for all engineering & management related issues during engineering & construction of cross country pipelines and infield pipelines. ;
* Close interaction with site construction management and contractors during execution of the project. ;
September 2005 — August 2006
1 year
Petrofac
Qatar
Flare superintendent
* Responsible for erection of Canting/decanting type Flare system, associated accessories including centrifugal and axial flow blower packages for Qatar Petroleum. ;
* Preparation/review of engineering dwgs for modifications to the systems and its implementation. ;
February 2004 — July 2005
1 year 6 months
Petrofac
Georgia
Rotating Equipment Erection & Commissioning Specialist
* Responsible for erection of Gas Turbines and MOL Pumps, DG sets, other rotating and static equipment, plant air conditioners etc at Oil pumping station AND also Commissioning of all equipment of the pumping station at PSG-2, Georgia, for British Petroleum (consultant Bechtel). ;
July 2001 — February 2004
2 years 8 months
W. J. Towell & Co LLc
Oman
Profit Center Manager-Power Generation
* Responsible to translate Customer's requirement pertaining to gas turbine installations to a comprehensive Equipment Proposal of either of our Principals. ;
* Review of detailed engg documents of rotating equipment from contractors (Principles) as an Approving authority on behalf of Clients. ;
* Responsible to educate Customer about new technologies and their implementation to save costs. ;
* Responsible for the budgets and its achievement. ;
March 1999 — April 2001
2 years 2 months
Rolls Royce
Great Britain
Chief Engineer
Rolls Royce Plc Ansty, UK
* Engineering of Gas Turbine Generating and pumping stations for preparation of technical offers. ;
* Review and modification of GT plants' auxiliaries (pumps, coolers, air filters etc) to improve plants efficiency ;
* Trouble shooting, maintenance and spares planning & procurement for Indian Customers of 108 Rolls-Royce gas turbine installations in India. ;
October 1994 — March 1999
4 years 6 months
Gas Turbines Group
India
Sr. Manager
DLF Industries Limited, Delhi, India
* System engineering of Gas Turbine driven Generators and its auxiliaries, preparation of engineering dwgs for approval by Client (Oil & Natural Gas Company Ltd and RSEB) as EPC Contractor. ;
* Supervision of assembly and erection of Gas Turbine Generator Power Plants of ONGC Assam & RSEB Ramgarh as EPC Contractor. ;
* Assisted in Performance Monitoring Test of Combined Cycle power plant of DPL, Assam. ;
* Led team of 12 engineers to organize Operation & Maintenance of RSEB's GTG power plant at Ramgarh, the desert.
Achievements:
* Successfully carried out system engineering of India's first aeroderivative gas turbine package (Gas turbine, coolers, fuel gas compressors, cooling water system including its pumps) single handedly from scratch without any support from any consultant. ;
* Successfully built & commissioned 2 nos. GTG plants, one on low btu gas; ;
November 1985 — April 1994
8 years 6 months
Gas Authority of India Limited
India
Sr. Deputy Manager
* O&M of gas supply Terminal Stations and Gas Compressor station during
Achievement:
* Led Design review and erection teams to build and commission gas compressor station in the tribal belt of India. ;
* Led team to successfully complete the 3 layer pipe coating of 700 km length of pipes. ;
* Led team to successfully lay 500 km of cross country pipelines in Gujrat and UP sectors. ;
* Led a small team to organize O&M of gas terminal station, valve stations and one compressor station on the cross country 36'', 42'' and 12'' pipeline. ;
* Design review of detailed engineering documents of Contractor M/s Toyo Engg Corp, Japan, pertaining to Gas Turbine compressor and generator installations including its auxiliaries- pumps, blowers, coolers, air conditioners etc. during
* Supervision of Erection, Commissioning, Operation & Maintenance of Gas Turbine Compressor station also having 2 nos gas turbine generators. ;
* Participated in construction of cross country pipelines in Gujrat and UP sectors in India. ;
September 1980 — October 1985
5 years 2 months
Oil & Natural Gas Commission
India
Executive Engineer
* Responsible for basic and detailed engineering of gas turbine generators, gas compressors and other rotating equipment (pumps, coolers and recip compressors) for offshore process platforms. ;
* Preparation of specifications, Technical evaluation of offers and Review of detailed engineering documents of consultants/contractors (IHI, KHI Japan) pertaining to Gas turbine driven generators, Centrifugal pumps, Gas compressors, water pumps, cranes and reciprocating equipment.
Achievement:
* First 33 gas turbines driven generators, compressors and pumps were either engineered by me or its detailed engineering was reviewed and approved by me, bids were evaluated by me to get the best combination and save money to the company. All of those turbine installations are still running. ;
* Member of Technical audit team to analyse any incident occurred with gas turbine installations Offshore. ;
February 1980 — September 1980
8 months
Hindustan Aeronautics Ltd
India
Pool Officer
* To Design a gas turbine jet engine for pilot-less aircraft, Design modification and engineering of modifications to auxiliaries (pumps, systems etc) of existing gas turbine engines. ;
About me
Oil & Gas Project Engineering, Construction
Higher education
1979
P.F.UNIVERSITY
Mechanical Engineering, Steam & Gas Turbines
1973
MEERUT UNIVERSITY
Natural Sciences, Bachelor of Science
Languages
Citizenship, travel time to work
Citizenship: India
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter